Our systems implementation methodology includes 3 main phases and related activities:
1. Client Analysis and Management (Phase 1)
In these phases, we gather information from the client, related and necessary to prepare a Process Report. This is the core input to start customizing ITOS for a specific client. Phase 1 includes the following activities:
Client’s Process Analysis
Process Report Generation
Client’s Approval
ITOS Presentation // current processes
Report. This is the document approved by the client (brief report explanation and operational agreements)
2. Customization and Adjustments
Customization. Once feedback from the tourism expert consultant is obtained (report explanation), we start to customize ITOS according to the client’s requirements.
Customization Quality Control. Coral Technologies carries out an internal verification of the configured ITOS version with the issued report.
Preliminary ITOS Installation to Client. We take the customized ITOS version to the client.
Preliminary ITOS Client’s Validation. The client verifies ITOS system according to the customization requested.
3. Installation
Installation & Training. Installation and training on final ITOS version. Poner la imagen orden de implantación ITOS.jpg
There is summarized ITOS implementation methodology, which allows us to install the product more rapidly. This is because the version installed is previously configured. For more information, contact us at
This email address is being protected from spam bots, you need Javascript enabled to view it
Site Map | Terms of use Ph. 506.2280 8297 - Fax 506.2225 6143 - PO Box 570 San Pedro 2050 San José, Costa Rica
This email address is being protected from spam bots, you need Javascript enabled to view it
Coral Technologies,Tour Operator Software, motor de reservas en linea, online booking engine, seo